REPLACING DIESEL POWER
Remote Comms Tower in Mining
Introduction
Eliwana Mine, part of the Fortescue Group in Western Australia chosen FW energy storage with DEYE Inverter & solar to replace their diesel power at a offgrid and remote communication tower at the mine site.
This is a key project to replace all their auxiliary power systems from diesel to solar energy
Site Statistics
| Customer | Eliwana Mine – Fortescue |
| Site location | Western Australia |
| Customer Segment | Industrial / Mining |
| Installer / EPC | Solar myWorld |
| Commissioned | May 2025 |
| Qty | Item |
|---|---|
| 2 | Battery: Freedom Won LiTE Home 10/8 52V |
| 1 | Inverter: DEYE 8kw Hybrid |
| 1 | PV: Integration 8kw solar |
Scope of Work
• Design
• Supply
• Install
• Training
Application
Energy Arbitrage / Energy Cost Management
Integration with Renewable Energy Sources
Power Quality / Reliability
Energy Backup Source
Peak Shaving